by C S » Wed Jan 19, 2011 11:06 pm
Eventually the basic shape of the base was completed, a vaguely retangular perimeter with a domed roof. As of now, the building was just an empty husk, with circular spaces in various places. Doors would be constructed at the gaps and machinery would be added. The mechs were now clustered around the building, waiting for the next phase of construction. Moving down the Foidaria's ramp were treaded vehicles, larger than the harvesting scout. The vehicles' main chasis was box like in shape, with the front extended outwards a foot in length. They lacked windows and were fitted with the familiar black and white armor. Behind them were containers, also fitted with treads. Black metal rails ran down their length. Inside them were components for the base. The vehicles pulled up along side the base, disconnecting the containers before driving into the base itself. The containers deployed after, the metal casing splitting apart, revealing giant machinery and other components. The mechs walked over to the component transports and put their metal hands onto the large peices of machinery. They lifted them up and started to move them towards the base, preparing for the installation.
Last edited by
C S on Thu Jan 20, 2011 12:14 am, edited 2 times in total.